Datum pegs for setting and holding finished floor level through a screed pour, with millimetre markings for a fast height check as the material goes down. A 3M adhesive base holds each peg to the substrate through the pour, and it becomes part of the finished screed. 100 mm peg height. Sold in a box of 100. Refina, part 647261.
FREQUENTLY BOUGHT WITH THIS
What customers order alongside it, from five years of counter orders.